CE-Certified Factory·Machinery Directive 2006/42/EC·Guangzhou, China Verified Alibaba Gold Supplier · Engineer reply ≤ 4h · WhatsApp +86 134 3039 1618 ↗
TRANSMESUN logoTRANSMESUNMEISHUN AUTOMATIC TRANSMISSION
Home/Factory & QC/Stage 1: Core Receiving & Full Disassembly
Incoming cores being disassembled and identified
Transmission core being fully disassembled at the TRANSMESUN Huadu factory

Real on-site footage from the Huadu factory floor

Process Walkthrough · Stage 1 of 10

Core Receiving & Full Disassembly

Stage 1 of the ten-stage TRANSMESUN remanufacturing process — the same procedure every unit follows at our Guangzhou Huadu factory, documented step by step.

CE-certified factoryIntertek assessed100% dyno tested12-month guarantee

Discuss Your Reman Program → WhatsApp Our Engineers

All ten stages
What happens in stage 1

Inside the stage.

Every remanufactured transmission starts as an incoming core, and stage 1 is where quality is decided before a single tool is picked up. All incoming cores are strictly inspected for housing cracks, structural damage and internal failure before production begins — a core that fails intake inspection does not enter the line.

Qualified units are then completely disassembled piece by piece. Every mechanical component is sorted, recorded and cataloged, so the rebuild that follows works from verified parts — and so your unit keeps a full traceability record from core to finished assembly.

Rebuilding on an unverified core means inheriting someone else's failure. Intake screening and full cataloging are what make the later stages meaningful — and what let us answer any post-shipment question with records, not guesses.

Acceptance criteria

What this stage verifies.

Applied to every unit on the line — the same standard shown in our on-site videos and verified by the 2026 Intertek on-site assessment (report 481351002_P+T).

Housing inspected for cracks and structural damage Internal failure assessed before production starts Full piece-by-piece disassembly — no partial teardown Every component sorted, recorded and cataloged Core-to-finished-unit traceability record
Stage 1 FAQ

Questions buyers ask about this stage.

What happens to cores that fail intake inspection?

Cores with housing cracks, structural damage or terminal internal failure are not put into production. Only qualified cores enter the remanufacturing line.

Do you keep disassembly records for each unit?

Yes. Components are sorted, recorded and cataloged at disassembly, and the record follows the unit through every later stage.

Can I see this stage being done?

Yes. The Huadu workshop is open to customers for on-site factory tours, and the same walkthrough can be run live over a video conference if you cannot travel. Workshop, testing lab, showroom and warehouse are all on one campus.

See the full ten-stage process →

Order with confidence

Every unit follows all ten stages.

MOQ from 1 piece · lead time from 1 day for in-stock codes · 12-month quality guarantee · fitment confirmed in writing before dispatch. Send your transmission code or nameplate photo — engineer reply within 4 business hours.

Send Inquiry → WhatsApp +86 134 3039 1618