CE-Certified Factory·Machinery Directive 2006/42/EC·Guangzhou, China Verified Alibaba Gold Supplier · Engineer reply ≤ 4h · WhatsApp +86 134 3039 1618 ↗
TRANSMESUN logoTRANSMESUNMEISHUN AUTOMATIC TRANSMISSION
Home/Factory & QC/Stage 3: Ultrasonic Deep Cleaning & Re-Inspection
Ultrasonic cleaning tank in operation
Ultrasonic deep cleaning of transmission components in specialised solvent baths

Real on-site footage from the Huadu factory floor

Process Walkthrough · Stage 3 of 10

Ultrasonic Deep Cleaning & Re-Inspection

Stage 3 of the ten-stage TRANSMESUN remanufacturing process — the same procedure every unit follows at our Guangzhou Huadu factory, documented step by step.

CE-certified factoryIntertek assessed100% dyno tested12-month guarantee

Discuss Your Reman Program → WhatsApp Our Engineers

All ten stages
What happens in stage 3

Inside the stage.

Reusable metal parts, housings and hydraulic components go through multi-cycle ultrasonic cleaning with specialised solvents. The process removes carbon buildup, old sludge, metal debris and stubborn residues — the contaminants that cause early transmission failure.

Cleaning is not the end of the stage. Every cleaned part then passes a secondary visual and structural inspection, so nothing with hidden contamination continues to reassembly.

Debris left inside a valve body or hydraulic circuit is one of the most common causes of early-life failure in rebuilt units. Multi-cycle cleaning plus re-inspection removes that risk before it can do damage.

Acceptance criteria

What this stage verifies.

Applied to every unit on the line — the same standard shown in our on-site videos and verified by the 2026 Intertek on-site assessment (report 481351002_P+T).

Multi-cycle ultrasonic cleaning, not a single dip Specialised solvents for carbon, sludge and debris Housings and hydraulic circuits fully flushed Secondary visual inspection after cleaning Structural re-inspection before parts are approved
Stage 3 FAQ

Questions buyers ask about this stage.

Why multi-cycle instead of a single cleaning pass?

Carbon buildup and old sludge do not release in one pass. Multi-cycle cleaning with specialised solvents removes stubborn residues that single-cycle cleaning leaves behind.

What happens if a part fails inspection after cleaning?

It does not continue. Every cleaned part passes secondary visual and structural inspection; anything with remaining contamination or damage is rejected.

Can I see this stage being done?

Yes. The Huadu workshop is open to customers for on-site factory tours, and the same walkthrough can be run live over a video conference if you cannot travel. Workshop, testing lab, showroom and warehouse are all on one campus.

See the full ten-stage process →

Order with confidence

Every unit follows all ten stages.

MOQ from 1 piece · lead time from 1 day for in-stock codes · 12-month quality guarantee · fitment confirmed in writing before dispatch. Send your transmission code or nameplate photo — engineer reply within 4 business hours.

Send Inquiry → WhatsApp +86 134 3039 1618